Appendix B
PARTS MANAGEMENT QUESTIONS FOR SYSTEM ENGINEERING
TECHNICAL REVIEWS AND LOGISTICS ASSESSMENTS
Table 2 contains examples of questions that may be asked during the system engineering technical reviews and LAs throughout the acquisition life cycle.
Table 2. Examples of Questions to Be Addressed at Different Stages of the Acquisition
Life Cycle
Item or activity |
SRR |
SFR |
PDR |
CDR |
PRR |
MS B, MS C, and FRP |
Post IOC |
Parts management plan |
Is parts management required on the contract in accordance with MIL-STD- 3018? |
Has a prelimi- nary parts management plan been developed? |
Has a parts management plan been updated and implemented? |
Has a parts management plan been updated and approved? |
Is the parts management plan being maintained? |
Are parts man- agement plans for system mod- ifications being maintained? |
|
Parts selection baseline |
Is a corporate baseline/parts selection list in place? |
Is a corporate baseline/parts selection list maintained in accordance with the parts management plan? |
Is a corporate baseline/parts selection list maintained in accordance with the parts management plan? |
Is a corporate baseline/parts selection list maintained in accordance with the parts management plan? |
Is a corporate baseline/parts selection list maintained in accordance with the parts management plan? |
Is a corporate baseline/parts selection list maintained for modifications in accordance with the parts man- agement plan? |
|
Parts selection and authoriza- tion process |
Has responsi- bility been established for selection and authorization of parts not on the baseline PPL for the program? |
Is the selection and authoriza- tion process in place for parts not on the baseline PPL for the pro- gram? |
Have all parts not on the baseline PPL and requiring approval been identified? |
Have all parts been approved? |
Have all parts not on the baseline PPL and requiring approval been identified and approved? |
Have all parts not on the baseline PPLs for modifica- tions and requiring approval been identified and approved? |
|
Has the parts selection order of preference been estab- lished to mini- mize the intro- duction of new parts and used to develop a preliminary PPL? |
Has the parts selection order of preference been estab- lished to mini- mize the intro- duction of new parts and used to develop a preliminary PPL? |
Has the parts selection order of preference been estab- lished for modi- fications to min- imize the intro- duction of new parts and used to develop a preliminary PPL? |
Source: https://assist.dla.mil -- Downloaded:
34 Check the source to verify that this is the current version before use.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business