MIL-HDBK-965
5.1.2 Option B - AA guidance through program reviews and IPTs. The contractor's parts management program is an internal procedure that complies with Government guidance, but the Government requires a level of participation in ensuring supportability over the life of the product. Also, the Government has
no interest in logistically maintaining the system or equipment. See figure 2.
PARTS CONTROL BOARD (OPTIONAL)
FIGURE 2. Option B - Government guidance through program reviews and IPTs.
The following procedures are for use for successful implementation of option B:
a. The contractor should respond to RFPs, by describing methods to reduce life cycle costs, achieve GIDEP participation, achieve parts standardization to minimize parts proliferation, and prevent DMS cases.
b. The AA monitors success of the program through contract language and scheduled periodic program reviews and interfaces with IPTs to assess the accomplishment of parts management goals and objectives and to discuss and resolve part problem areas/issues.
c. There should be no CDRL DID for parts submissions. However, the contract may require AA and
MPCAG access to an as-built parts list.
d. The contractor may request advice from the AA and MPCAG on parts selections; however, the contractor has no obligation to request or to accept such advice. If MPCAG parts advice is requested, MPCASS is the preferred method of submitting the parts evaluation requests to the MPCAG.
e. Contractor may elect to establish a PCB even though it is not a contractual requirement.
10