support, or commercial support. In general, the IPT should avoid modifying the existing sup- port system (and the accompanying documentation).
One of the most important considerations concerning configuration management and con- trol is the ability of the user to adjust to possible configuration changes beyond his control, or even visibility. Relying on the contractor's configuration management system or obtaining con- tractor logistic support may be the best solution.When the contractor is responsible for config- uration control, the data requirements for engineering change proposals can be eliminated, reducing the amount of data the contractor must provide the government. Data requirements should be kept to the minimum.
Source: https://assist.dla.mil -- Downloaded:
24 Check the source to verify that this is the current version before use.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business