Provisions Governing Qua/ification SD-6
any way recommends or endorses the manufacturer's product in preference to other qualified products. Violation is cause for removal from the electronic QPL/QML.
4. The electronic QPL/QML applies only to products produced in, or processes used in, the plant specified in the letter of notification. The listing is effective at 8:00 a.m. (local time of the Qualifying Activity) as of the date of the letter of notification.
5. The electronic QPL/QML applies to amendments or revisions of the specification, unless otherwise notified.
6. The electronic QPL/QML applies only to products or processes identical to those qualified (or to products defined in the family of products granted qualification
coverage). The Qualifying Activity must be advised in advance of any intended change to a qualified product or process and must be provided with a complete description of the change. Failure to notify the Qualifying Activity of any change is cause for removal from the electronic QPL/QML regardless of the extent of the change.
7. Manufacturers must comply with the requirements for retention of qualification to retain the electronic QPL/QML. Failure to comply will be sufficient cause for removal from the electronic QPL/QML.
Figure 3-1 is a flow chart of the above process.
Government sends applicant
and specification advertised qualification qualification approved Information*
Is facilities audit or Manufacturer Is the applicant a plant survey Testing Conducted*** manufacturer or a required? distributor?
No
Yes *Information includes:
•A copy of the latest issue of the
Specification. Facilities audit or •SD-6
plant survey •A schedule for charges for testing, if Distributor conducted Applicable
•Facilities survey requirements, when applicable
Gov't reviews •A caution not to begin qualification testing test results from until the manufacturers has been notified that supplier and if the information submitted is satisfactory
approved •Additional information if required
submits QPL/QML ** Distributor will include original
into the QPD manufacturer's identification or code in the part
*** The qualifying activity may extend Distributor provides qualification approval to a rebranded product certification from without further test, if the manufacturer manufacturer that
Stop certifies that the rebranded product is the distributor can rebrand**
same as the product previously qualified under the manufacturer's designation.
Figure 3-1. Initial Qualification Process.